Kovel Porto Industrial Park in Volyn Region Builds Second Railway Line

Add Prompolitinform to your Preferred Sources

You will see our news more often on Google and find important Prompolitinform stories faster.

INFRASTRUCTURE 26.11.2026 / author:
Kovel Porto Industrial Park in Volyn Region Builds Second Railway Line

The project involves laying 7.5 km of track of both standards to handle large cargo volumes

The Kovel Porto industrial park in the Volyn region has begun construction of the second phase of its railway infrastructure. The project will cost 232.5 million UAH, with completion scheduled for 2027. This was reported by Delo.ua citing Dmytro Kysylevskyi, according to the portal PromPolitInform.

The work is being carried out by the company Kompresorna Tekhnika, which initiated the creation of the park. This stage of expansion involves the construction of 18 railway tracks with a total length of 7.5 kilometers, which will allow the facility to receive trains of more than 20 wagons.

Technical specifications of the railway hub

The site will feature an extensive network of both broad gauge (1520 mm) and European standard gauge (1435 mm) tracks. This configuration will allow wagons to be delivered directly to the customs terminal and loading points, speeding up export operations and logistics for domestic manufacturing.

The first phase of the infrastructure was completed in September 2026, and the facility is currently finalizing its permit documentation with Ukrzaliznytsia JSC. At the same time, experts have already started pre-project work for the third phase of construction, which is intended to increase the park’s throughput capacity to 50 wagons.

State infrastructure funding

For the construction of the first phase, Kovel Porto utilized funds from the state program for the development of industrial parks. In 2024, 69.8 million UAH was allocated from the state budget on a 50:50 co-financing basis.

Under the terms of state support, the investor is required to commission at least 5,000 square meters of industrial space and attract at least two manufacturing participants within three years.

Photo: Delo.ua

Read also: Ukrainian forces repel 28 attacks on Pokrovsk axis, 203 combat clashes recorded in 24 hours