Space-based computing on the Vera Rubin NVL72 platform is scheduled to launch in 2027
SpaceX, in partnership with NVIDIA, is launching an orbital computing initiative named StarMind. The deployment of the first modules is scheduled for the third quarter of 2027, with active infrastructure expansion continuing through 2028 and 2029. This was reported by RBC-Ukraine (Ольга Завада) citing Interesting Engineering, according to the portal PromPolitInform.
The hardware foundation for the new space computing systems will rely on the advanced NVIDIA Vera Rubin NVL72 platform. This equipment will allow complex computing tasks to be performed directly in space, shifting workloads beyond traditional terrestrial data centres.
Next Generation of Starlink Satellites
In parallel, the fourth generation of Starlink satellites is being developed, featuring ten times the capacity of the previous version. Upgraded laser communication technology will serve as the core enhancement of the new hardware.
Plans call for equipping each satellite with 100 next-generation laser links. Data transmission speeds across each connection will exceed 10 terabits per second.
A constellation of over 100,000 satellites with 100 links each could effectively compete with undersea internet cables. Light travels approximately 40% faster through open space than through glass fibre-optic cables, following direct paths rather than landlines.
Terrestrial Computing Hubs and Semiconductor Manufacturing
Beyond orbital initiatives, Elon Musk’s companies are expanding their terrestrial computing and semiconductor manufacturing infrastructure across several US states.
In Memphis, Tennessee, a massive computing facility operates with its own power infrastructure exceeding 1 GW. Construction of this facility was completed in roughly one year, compared to the standard five-year timeline.
Additionally, chip production facilities are expanding in Texas. Tesla is establishing a research centre at Gigafactory Texas to reduce chip development cycles from a year to one month, while the Terafab plant in Grimes County will handle full-cycle semiconductor manufacturing.
Photo: RBC-Ukraine
Read also: Musk allocates $475 million to support Republicans ahead of the 2026 elections