About 200 teams are working in all regions on key routes of national importance.
Almost half of the planned volume of repair work on highways has already been completed, and the work itself is proceeding at a record pace: from 4-5 thousand sq. m per day in winter to almost 200 thousand sq. m now. This is reported by Dengi.ua with reference to the Ministry of Development’s post on the TG channel. The PromPolitInform portal informs.
“Such a pace and volume of work has not been seen during the years of full-scale war. In fact, the restoration of the road surface is taking place with the involvement of the maximum number of workers and necessary equipment. This has made it possible to carry out repairs on more than 4.2 million sq. m of roads. This is almost half of the volumes on roads of national importance that are planned to be completed by June 1. In total, we plan to restore about 10 million sq. m of road surface,” said Development Minister Oleksiy Kuleba.
It is reported that about 200 crews are working in all regions on key routes of national importance, and among the main directions of the route:
M-03 Kyiv – Kharkiv – Dovzhansky
M-05 Kyiv – Odesa
M-06 Kyiv – Chop
M-11 Lviv – Shehyni (to Krakow) M-11 Lviv – Shehyni
M-19 Domanovy – Kovel – Chernivtsi – Terebleche
M-21 Vystupovychi – Zhytomyr – Mogilev-Podilsky
At the same time, 1,900 workers are to repair about 200 thousand sq m of road per day.
As previously reported, the Infrastructure Restoration and Development Service in Lviv region has ordered Onur Construction International LLC for UAH 393.85 million for the current repair and operational maintenance of the public highway of national importance in Lviv region, the M-06 Kyiv – Chop route.
As PromPolitInform previously reported, Ukraine plans to return mandatory technical inspection for all passenger cars by the end of 2027.
